In Uvalde, line mechanic Noe Rubio paused a service installation after noticing the transformer on the primary line looked wrong. A follow-up check revealed the transformer was rated for 7.2/12.47 kV while the line was 14.4/25 kV. This is a mismatch that could have caused equipment failure if energized.
He reported the issue to his supervisor and the contractor coordinator, preventing damage and a potential outage for the customer. This close attention to detail is a reminder to always verify equipment and double-check work, especially on new construction or when you weren’t the one who completed the original installation. His actions helped keep crews safe and customers powered.